Central Expressway Project (CEP) is a very important and huge project in Sri Lanka. It was divided into 4 stages:

Stage 1: Kadawatha (KM 0.0km) to Meerigama (KM 37.1)

Stage 2: Meerigama (KM 37.1) to Kurunegala (KM 76.8) and Ambepussa link road (KM 9.3)

Stage 3: Pothuhera (KM 0.0) to Galagedara (Kandy) (KM 32.5)

Stage 4: Kurunegala (KM 76.8) to Dambulla (KM 137.1) 

A lot of bridges were using I-girders with different lengths/ types.

Type: Steel I-Girder Formwork

Length: 15m, 20m, 25m, 30m, 35m
 
Owner: Road Development Authority
Contractor: ICC, TUDAWE, CEC, KDAW, MAGA
Period: Sep 2017 – Mar 2019
 
UTRACON'S INVOLVEMENT
1. Design & calculation fabrication drawings, working method statement
2. Fabrication of steel mould and accessories
3. Trial mock-up at the factory
4. Logistics to Client’s port