(+84 24) 3201 3207
THE PROJECT
Urban Railway Cat Linh – Ha Dong Line is one of six lines of Hanoi Urban Railway Project, which is a light railway elevated serving public passenger with total length of 13.05km, consisting of 12 stations.
This line starts from the Intersection of Cat Linh – Giang Vo, which is the future area of urban passenger transiting of Hanoi, connecting between urban railway Cat Linh – Ha Dong with Nhon – Hanoi Railway Station and fast bus line BRT.
Client : Ministry of Transport
General Contractor: China Railway Sixth Group Co., Ltd
Construction Period: Nov 2015 – Oct 2016
UTRACON’S INVOLVEMENT
Our scope of works involved construction of Cast in situ on the falsework from KR05-KR07 & TL0-TL12, between Depot and Station Yen Nghia.
(+84-24) 3201 3207
utraconvn@utracon.com