Bridges Construction

Ramp of Depot - Hanoi MRT

 

 THE PROJECT

Urban Railway Cat Linh – Ha Dong Line is one of six lines of Hanoi Urban Railway Project, which is a light railway elevated serving public passenger with total length of 13.05km, consisting of 12 stations.

This line starts from the Intersection of Cat Linh – Giang Vo, which is the future area of urban passenger transiting of Hanoi, connecting between urban railway Cat Linh – Ha Dong with Nhon – Hanoi Railway Station and fast bus line BRT.

 

Client                : Ministry of Transport

General Contractor: China Railway Sixth Group Co., Ltd

Construction Period: Nov 2015 – Oct 2016

 

UTRACON’S INVOLVEMENT

Our scope of works involved construction of Cast in situ on the falsework from KR05-KR07 & TL0-TL12, between Depot and Station Yen Nghia.

 

 

Support online

Quick link