Thuy Tien Bridge (B1 Bridge)
THE PROJECT
Project name: Design and Construction of Thuy Tien Bridge and Approach Road under the Project of Van Giang commercial and tourism township - Ecopark.
Bridge type: Cast in-situ arch bridge, 5-span continuous, reinforced concrete continual beam and slab structure.
Total Bridge Length: 114.1m x 2 bridges
Bridge Longest Span: 30 m
Deck Width: 18.5m x 2
Location: Hung Yen Province, Vietnam
Client: Viet Hung Urban Development and Investment JSC (VIHAJICO)
Construction Period: Nov 2016 – Dec 2018
(1).jpg)
CONSTRUCTION METHOD
Pile Foundation: PHC Pile.
Soft Ground Treatment: Vertical drain & Surcharge method.
Superstructure: Full staging method.
.jpg)
UTRACON'S INVOLVEMENT
Our scope of works involved as General Contractor: Design and Construction of the whole package under EPC (Engineering, Procurement & Construction) Contract package.
.jpg)