My Thuan 2 Stayed cable bridge - Tien Giang
My Thuan 2 bridge has starting point at Km101+126, connecting to Trung Luong - My Thuan Expressway Project (An Thai Trung intersection, Cai Be district); The end point is at Km107+740, connecting with the My Thuan - Can Tho Expressway Project (intersection of National Highway 80, Vinh Long City, Vinh Long Province). The bridge is parallel to National Highway 1 and crosses the Tien River and 350m upstream from the existing My Thuan bridge, design speed 100km/h.
Bridge type: Cable stayed bridge with 02 diamond shape pylons, 125m high
Total Bridge Length: 2330m, 150+350+150m main bridge with 6 lanes.
Period: Feb 2020 - Dec 2023
Investor: PMU 7 – MOT
Client: Trung Nam – Trung Chinh – VNCN E&C JV
UTRACON'S INVOLVEMENT
1. Supply Auto Climbing Formwork system for 02 pylons
2. Supply Supervisors for Assembly & Operation work