System Formwork and Falsework

My Thuan 2 Stayed cable bridge - Tien Giang

My Thuan 2 bridge has starting point at Km101+126, connecting to Trung Luong - My Thuan Expressway Project (An Thai Trung intersection, Cai Be district); The end point is at Km107+740, connecting with the My Thuan - Can Tho Expressway Project (intersection of National Highway 80, Vinh Long City, Vinh Long Province). The bridge is parallel to National Highway 1 and crosses the Tien River and 350m upstream from the existing My Thuan bridge, design speed 100km/h. 

Bridge type: Cable stayed bridge with 02 diamond shape pylons, 125m high 

Total Bridge Length: 2330m, 150+350+150m main bridge with 6 lanes.

Period: Feb 2020 - Dec 2023

Investor: PMU 7 – MOT 

Client:  Trung Nam – Trung Chinh – VNCN E&C JV

 

UTRACON'S INVOLVEMENT
1. Supply Auto Climbing Formwork system for 02 pylons
2. Supply Supervisors for Assembly & Operation work
 
  

 

  
 
  
 
 
 
 

 

Support online

Quick link