THE PROJECT
Project name: Design and Construction of Bac Hung Hai Bridge and Approach Road under the Project of Hanoi-Hung Yen Interprovincial Transportation Route.
Bridge type: 4-span continuous RC Slab (Approach Bridge) and 5-span Continuous Prestressed Box Girder (Main Bridge)
Total Bridge Length: 370m x 2 bounds
Bridge Longest Span: 88m
Deck Width: 18.5m

Location: Hung Yen Province, VN
Client: Viet Hung Urban Development and Investment JSC (VIHAJICO)
Construction Period: Dec 2010 – Dec 2014
CONSTRUCTION METHOD
Bored Pile: Earth Drill method
Soft Ground Treatment: Vertical Drain & surcharge method
Superstructure: Balanced cantilever erection method using Form Traveler & full staging method
Approach Bridge: Full staging method
UTRACON'S INVOLVEMENT
Our scope of works involved Design and Construction of the whole project under EPC Method