Bridges Construction

Bac Hung Hai Bridge

 THE PROJECT

Project name: Design and Construction of Bac Hung Hai Bridge and Approach Road under the Project of Hanoi-Hung Yen Interprovincial Transportation Route.

Bridge type: 4-span continuous RC Slab (Approach Bridge) and 5-span Continuous Prestressed Box Girder (Main Bridge)

Total Bridge Length: 370m x 2 bounds

Bridge Longest Span: 88m

Deck Width: 18.5m

Location: Hung Yen Province, VN

Client: Viet Hung Urban Development and Investment JSC (VIHAJICO)

Construction Period: Dec 2010 – Dec 2014

 

CONSTRUCTION METHOD

Bored Pile: Earth Drill method
Soft Ground Treatment: Vertical Drain & surcharge method
Superstructure: Balanced cantilever erection method using Form Traveler & full staging method
Approach Bridge: Full staging method

 

UTRACON'S INVOLVEMENT

Our scope of works involved Design and Construction of the whole project under EPC Method

 