System Formwork and Falsework

Rach Mieu 2 Stayed Cable Bridge - Tien Giang

THE PROJECT

Rach Mieu 2 Bridge is a Stayed-Cable bridge pass over the Tien River connecting Tien Giang province and Ben Tre province in the Mekong Delta, Vietnam.

Rach Mieu 2 Bridge is located 3.8 km from  Rach Mieu Bridge upstream of Tien River. The Rach Mieu 2 bridge and the approach road have a total length of 17.6 km. The bridge crosses the main stream of the Tien River and is a cable-stayed bridge with a length of 1,954 m, a main span of 270 m long, and a 17.5 m wide bridge deck for 4 lanes of traffic. The clearance of the bridge is 220 m wide and 30 m high.

Bridge type: Cable stayed bridge with 02 H-shape pylons, 118.5m high 

Total Bridge Length: 1950m, 120+270+120m main bridge with 4 lanes

Period: 2023 - Dec 2025

Investor: My Thuan PMU  – MOT

Client:  Trung Nam E&C – Trung Chinh JV

 

UTRACON'S INVOLVEMENT
1. Supply Auto Climbing Formwork system for 02 pylons
2. Supply Supervisors for Assembly & Operation work
 

 

  

 

 

  
 
  
 
 
 
 

 

Support online

Quick link