THE PROJECT;
Urban Railway Cat Linh – Ha Dong Line is one of six lines of Hanoi Urban Railway Project, which is a light railway elevated serving public passenger with total length of 13.05km, consisting of 12 stations.
This line starts from the Intersection of Cat Linh – Giang Vo, which is the future area of urban passenger transiting of Hanoi, connecting between urban railway Cat Linh – Ha Dong with Nhon – Hanoi Railway Station and fast bus line BRT.
Client : Ministry of Transport
General Contractor : China Railway Sixth Group Co., Ltd
Construction Period : Jul 2014 – May 2015
UTRACON’S INVOLVEMENT
Our scope of works involved construction of balanced cantilever Box Girder from HR15-HR18, between Station Ha Dong Bus and Station Ha Dong.