PROJECT:
Ryobi project aims to build a 12,000–sqm area for Bonded Warehouse and Logistics, a 15,000–sqm Container Freight Station (CFS) and a 43,300–sqm Container Yard. All facilities will be equipped with 6–storey pallet racking systems and 24/7 surveillance camera systems, as well as comply with the ISO and WHO–GMP standards in order to be qualified for storage of hi-tech products (electronic products) and the other high-class products manufactured at Saigon Hi-Tech Park.
Location: HC slot, D2 street, Sai Gon Hi-tech park, Tang Nhon Phu ward, district 9, Ho Chi Minh.
Client: Ryobi (Vietnam) Distribution Service Co., Ltd
Architect and Design : ICC Consultancy Jsc.
Main-Contractor: Obayashi Vietnam
Construction period: 01/2015 – 03/2016
UTRACON'S INVOLVEMENT
Our scope of works involved design, supply and installation of Post-tensioning works in beam and slab.